Calculate the expected loads the rigging will be exposed to. Select compatible components to make up the rigging system and choose the position of anchor points for rigging components. Take into account the expected load and the positions of the ground crew, other anchor points, equipment, planned drop zone, and processing area. Remove lower tree sections using suitable cuts, minimising shock loading in the rigging system.